Center for Federal Accountability
PHMSA proposes to overhaul LNG facility rules it says have not been updated since 2006, widening what operators must report and keep on file
The Pipeline and Hazardous Materials Safety Administration (PHMSA) would adopt the 2026 industry standard for liquefied natural gas (LNG) facilities, widen incident reports to releases of any hazardous fluid, require safety-related condition reports from initial startup but not during commissioning, and add recordkeeping that raises its recordkeeping estimate by 5,401 hours a year. Comments close January 4, 2027.
2026-11-11 · Pipeline and Hazardous Materials Safety Administration, Transportation Department · Information · Docket PHMSA-2019-0091
The Pipeline and Hazardous Materials Safety Administration (PHMSA) proposes to update its safety rules for liquefied natural gas (LNG) facilities, which it says have not been updated since 2006. Operators would have to report incidents involving releases of any hazardous fluid, not only gas, LNG, liquefied petroleum gas and refrigerants. They would report safety-related conditions found during initial startup, which PHMSA calls a clarification, but no longer during commissioning. They would also keep more records, some for the life of the facility.
PHMSA published the proposal in the Federal Register on November 3, 2026 (91 FR 69314), under docket PHMSA-2019-0091 and Regulation Identifier Number 2137-AF45. Comments are due January 4, 2027, at regulations.gov (see "How do I comment?" below). No comments had been posted when CFA checked the docket on November 3. The Federal Register lists the proposal as significant.
What would an LNG operator report, and when?
An incident is a release with serious consequences, such as a death, a hospitalization or property damage of $122,000 or more, or an emergency shutdown. A safety-related condition is a problem that could lead to one, such as a crack or a leak that constitutes an emergency (proposed §§ 191.3 and 191.23, 91 FR 69379). The proposal changes reporting under 49 CFR part 191, and recordkeeping under part 193, at several points in a facility's life. The steps below follow the proposed text and PHMSA's explanation of it.
- Before construction (unchanged). The operator notifies PHMSA's National Registry of Operators; current rules require at least 60 days' notice before construction. PHMSA encourages notice at least 60 days before the first construction-related activity, such as buying materials or clearing the site.
- Commissioning (changed). Equipment is tested before startup. Incidents must still be reported; safety-related conditions would not be.
- Initial startup (stated in the rule). Safety-related conditions are reportable under the new § 191.23(c). Under § 191.25(a), a report is due within 5 working days after the operator first determines the condition exists, and no later than 10 working days after it discovers the condition.
- Operation (widened). Incidents would cover releases of any hazardous fluid, not only gas, LNG, liquefied petroleum gas or refrigerants. Safety-related conditions would cover facilities that contain or process any hazardous fluid, not only gas or LNG.
- Ongoing duties (new). The annual report form would let an operator elect permanent, small-scale facility status. The change log for plans and procedures is kept for the life of the facility; failure investigation records for at least five years.
Source: PHMSA proposed rule, 91 FR 69323-69324, 69376-69379 and 69383 (Nov. 3, 2026).
Today 49 CFR 191.23 requires reports of safety-related conditions at facilities "in service." PHMSA says it has read "in service" to start whenever a hazardous fluid enters a facility. That includes commissioning, when equipment is tested before startup. PHMSA now proposes to require these reports from initial startup but not during commissioning. Operators would still have to report incidents during commissioning (91 FR 69323-69324).
What else would the rule change?
PHMSA's LNG rules are largely based on the 2001 edition of the National Fire Protection Association (NFPA) standard 59A. The proposal would adopt the 2026 edition (NFPA 59A-2026), which PHMSA says is seven editions newer (91 FR 69314). It would add rules for permanent, small-scale LNG facilities, as the Protecting our Infrastructure of Pipelines and Enhancing Safety (PIPES) Act of 2016 required. It would also offer an optional risk-based operations and maintenance program, as the PIPES Act of 2020 required, for facilities regulated by the Federal Energy Regulatory Commission (FERC) (91 FR 69314-69315). Operators could also site facilities using a quantitative risk analysis under chapter 19 of the standard.
PHMSA estimates the rule would save about $98 million a year, with future years discounted at 3 percent. It says it could not put a number on some new costs, many savings, or the safety benefits (91 FR 69315).
How much paperwork does PHMSA estimate?
The Paperwork Reduction Act section lists six information collections (91 FR 69376-69378). A response is one report, notice or record. CFA compared each estimate for an existing collection with its current approval on the Office of Management and Budget's (OMB) site, reginfo.gov.
Recordkeeping (OMB 2137-0048) would rise from 40,400 responses and 12,120 hours a year to 42,284 responses and 17,521 hours. That is an increase of 1,884 responses and 5,401 hours, or about 45 percent. New records include a log of changes to plans and procedures kept for the life of the facility, failure investigation records kept at least five years, and training records that list each worker's name, job title, tasks and training dates (proposed §§ 193.11, 193.15 and 193.409, 91 FR 69382-69386).
Incident reports (2137-0635) would rise by 4 responses and 48 hours, to 1,003 responses and 4,504 hours. Safety-related condition reports (2137-0578) would rise by 2 responses and 12 hours, to 176 responses and 1,056 hours. The operator registry (2137-0627) and annual reports (2137-0522) would not change.
A new collection for notifications and petitions has no OMB number yet. PHMSA estimates it at 5 responses and 5 hours a year. Its description includes siting packages and the implementation plans filed by operators that choose the risk-based program. PHMSA would have 30 days to approve a plan. If it does not, the plan is treated as denied (proposed § 193.505, 91 FR 69388).
Where do PHMSA's paperwork figures not line up?
These are CFA's observations from the published text and OMB's records.
The proposal lists the current expiration date of the annual report collection (2137-0522) as October 31, 2026, before the proposal's own publication date. OMB's record shows a previously approved expiration of November 30, 2026, and an extension request that OMB received on June 24, 2026 and has not yet concluded. The proposal also titles this collection "Annual and Incident Reports," while OMB's record titles it "Annual Reports for Gas Pipeline Operators."
The description of the safety-related condition collection says operators report conditions "during commissioning." PHMSA's explanation of proposed § 191.23(c), including in the same Paperwork Reduction Act section, excludes commissioning (91 FR 69323-69324, 69376-69377). The same description says PHMSA expects "two additional reports over three years," but the annual total it gives is 2 higher than the current approval.
The recordkeeping description says operators would spend "approximately 40 hours, annually" on the new requirements. It does not say whether that is per operator or in total, or how many operators it assumes, so the 5,401-hour increase cannot be traced to it from the published text. The new notifications collection averages one hour per response, and the proposal does not explain that estimate.
PHMSA notes industry comments about occasionally overlapping reports to the Coast Guard, FERC and PHMSA, and says aligning them would require more coordination among the agencies (91 FR 69322). CFA found no proposed change to that overlap in the text.
Does CFA grade PHMSA?
No. The Transportation Department is not among the agencies CFA grades, so CFA has no grade for PHMSA. CFA's own figures do not measure LNG safety or reporting.
How do I comment?
Comments are due January 4, 2027. File them at regulations.gov under docket PHMSA-2019-0091, or by mail or hand delivery to the Transportation Department's Docket Management System, 1200 New Jersey Avenue SE, Washington, DC 20590-0001. PHMSA posts comments without changes, including any personal information. Mark confidential business information "confidential" on each page that contains it. Send it to the PHMSA contact named in the notice, with a redacted copy and an explanation of why it is confidential.
Send comments on the information collections to OMB's Office of Information and Regulatory Affairs, Attn: Desk Officer for the Department of Transportation, 725 17th Street NW, Washington, DC 20503, and to PHMSA, by the same date.
What to watch
Whether OMB approves the pending extension of the annual report collection, and whether the final rule's paperwork section changes the listed expiration date and the commissioning wording.
Whether PHMSA publishes the basis for the 5,401-hour recordkeeping increase and the one-hour estimate for notifications and petitions.
Whether the final rule keeps the line between commissioning and initial startup for safety-related condition reports.
Whether PHMSA aligns its reports with those sent to FERC and the Coast Guard.
Authorities
- Pipeline and Hazardous Materials Safety Administration, Pipeline Safety: Amendments to Liquefied Natural Gas Facilities, 91 FR 69314 (Nov. 3, 2026), FR Doc. 2026-22396
Each operator of an LNG facility must report any safety-related condition specified in paragraph (a) of this section that occurs during initial startup before operations.
The proposed rule: the reporting changes in part 191, the new recordkeeping in part 193, the Paperwork Reduction Act estimates, the cost estimate and the comment deadline. - Regulations.gov docket PHMSA-2019-0091 Where comments are filed and posted, with the preliminary regulatory impact analysis, the draft environmental impact statement and the plain-language summary.
- 49 CFR part 191, Transportation of Natural and Other Gas by Pipeline; Annual Reports, Incident Reports, and Safety-Related Condition Reports The current reporting rules, including § 191.23, which limits safety-related condition reports to facilities "in service."
- OMB, reginfo.gov, ICR 202606-2137-014, Annual Reports for Gas Pipeline Operators (OMB 2137-0522) Shows a previously approved expiration of November 30, 2026, 2,445 responses and 104,596 hours, and an extension request received by OMB on June 24, 2026.
- OMB, reginfo.gov, ICR 202402-2137-003, Record keeping Requirements for Liquefied Natural Gas (LNG) Facilities (OMB 2137-0048) The current approval of 40,400 responses and 12,120 hours, the baseline for CFA's comparison.
- OMB, reginfo.gov, ICR 202508-2137-003, Incident Reports for Natural Gas Pipeline Operators (OMB 2137-0635) The current approval of 999 responses and 4,456 hours.
- OMB, reginfo.gov, ICR 202512-2137-003, Reporting Safety-Related Conditions on Gas, Hazardous Liquid, and Carbon Dioxide Pipelines and Liquefied Natural Gas Facilities (OMB 2137-0578) The current approval of 174 responses and 1,044 hours.
- OMB, reginfo.gov, ICR 202501-2137-001, National Registry of Pipeline and LNG Operators (OMB 2137-0627) The current approval of 744 responses and 744 hours, which the proposal leaves unchanged.
- National Fire Protection Association, NFPA 59A, Standard for the Production, Storage, and Handling of Liquefied Natural Gas The industry standard whose 2026 edition the proposal would incorporate by reference.
- Protecting our Infrastructure of Pipelines and Enhancing Safety (PIPES) Act of 2016, Public Law 114-183 Section 27(b) directed PHMSA to set rules for permanent, small-scale LNG facilities.
- PIPES Act of 2020, in Public Law 116-260 Section 110 directed PHMSA to develop an alternative, risk-based operations and maintenance approach for large-scale LNG facilities.